Visit us on Google+

422 Bridge Work Lane Closures Set Tuesday

LOWER POTTSGROVE PA – Think of this as a transportation-related Halloween surprise.

Eastbound U.S. Route 422 motorists will encounter alternating right and left lane closures and a traffic shift due to bridge construction Tuesday (Oct. 31, 2017) from 9 a.m. to 10 p.m., between its Route 724 and Armand Hammer Boulevard interchanges in Lower Pottsgrove, the Pennsylvania Department of Transportation reported.

Drivers are advised to allow extra time when traveling through the work area. The schedule of general contractor J.D. Eckman Inc. of Atglen PA depends on the weather.

Editor’s note: PennDOT issued a correction Monday (Oct. 30) to the previously stated hours for these lane closures. Instead of 9-10 a.m., as it earlier announced, the hours are from 9 a.m. to 10 p.m. This story was revised to reflect that change.

Photo from Google Images

Like what you read? Get even more of it, free. Subscribe to The Post.