Paving Under Way on Pruss Hill Road in Limerick

OFFERING A SMOOTHER RIDE – Residents on Pruss Hill Road in Limerick Township, who have endured months of sewer installation work, saw a road paving crew (at top and below) begin laying fresh asphalt Monday morning (June 15, 2020). The road was closed at its intersection with Masters Drive, and work got under way in the 3400 block on the south lane of the long, straight stretch of highway. Workers there said they should be finished later this week.

Paving Under Way on Pruss Hill Road in Limerick

Photo by The Post Publications