422 Lane Closures, Traffic Stops Scheduled Next Week

KING OF PRUSSIA PA – U.S. Route 422 drivers will encounter lane closures in both directions for construction activities under two separate improvement projects in Limerick and Lower Pottsgrove townships, the Pennsylvania Department of Transportation reported.

The work schedule and locations are:

  • Alternating left- and right-lane and shoulder closures will be in place Monday through Friday (July 19-23, 2021) from 5 a.m. to 2 p.m. daily for rumble strip and pavement marker installation on westbound 422 between Township Line Road and Evergreen Road, and at the ramps to the Sanatoga and Limerick interchanges, in Limerick Township; and
  • Periodic 15-minute traffic stoppages will be in place Thursday (July 22) from 9 a.m to 2 p.m. on eastbound and westbound 422 between the Armand Hammer Boulevard and Sanatoga interchanges in Lower Pottsgrove Township, for bridge beam installation. The installation had previously been scheduled for Wednesday night (July 21).

Drivers should budget extra time for travel through the work areas. Backups and delays could be significant, PennDOT advised. All scheduled activities depend on acceptable weather.

Graphic by David Perry via Usaf, modified by The Post and used within the public domain