Sewer Line Installation Affects S. Limerick Rd.

LIMERICK PA – Contractors are scheduled to start work Monday (Aug. 15, 2022) to install a sanitary sewer crossing on South Limerick Road as part of the Ironwood housing community, Limerick Township announced. The work is expected to last several days, so long as weather conditions are acceptable, a notice on its website reported.

Asa result, a portion of the road will be closed daily from 7 a.m. to 5 p.m. during the work period, it added. South Limerick Road will be open to local residents and businesses during the closure. For travelers, alternate routes will be available using Ridge Pike, North Lewis, and Linfield-Trappe Roads.

Photo by The Post