Roadside brush and tree-clearing operations between Trooper and Valley Forge roads, as well as the placement of concrete barriers, will require shoulder closures and some lane restrictions.
Besides pavement markings on Armand Hammer Boulevard at Industrial Highway, a traffic study makes two more suggestions to increase safety near the boulevard's U.S. Route 422 interchange.
You can spot six different cranes between the work being done on the Schuylkill River bridge near the Armand Hammer Boulevard exit for U.S. Route 422, and the westbound off-ramp at the same location.
Installation of concrete beams for the U.S. Route 422 bridge near Stowe will cause traffic to be re-routed over several nights next week at the Route 100 interchange.
Police issued a warning Wednesday on their Facebook page, alerting U.S. Route 422 drivers of a road rage incident that occurred on the highway in nearby Exeter earlier this week.
PennDOT's contractor working on the westbound on-ramp to U.S. Route 422 at Armand Hammer Boulevard finished a week early. The ramp should open Tuesday.
A construction vehicle is suspected to have hit a utility pole Tuesday, bringing down power lines across a portion of U.S. Route 422. It slowed traffic to a crawl for about 12 hours.
All U.S. Route 422 traffic will shift to the new eastbound bridge near Armand Hammer Boulevard. The westbound on-ramp there will close. And the westbound bridge will start to come down.